Sr. No | Name of Project | Length | Status |
1 | Consultancy Service for Feasibility study, Detailed Project Report for widening to 2- Lane with paved shoulders/Four Lane from 0.000 To Km. 107.660 of Pamarru-Digamarru Road of NH 165 in the State of Andhra Pradesh. | 107.66 | Ongoing |
2 | Preparation of Project Report for establishment of NH-2B with a minimum of 2-lane with paved shoulder configuration starting from Bolpur to Mallarpur of NH-2B in the District of Birbhum, West Bengal | 57 | Ongoing |
3 | Preparation of DPR for (i) Establishment of road link of NH-80 from Ch: 282.600 km near Bewa bridge at Jharkhand border merging with NH-34 near Farakka in the district of Murshidabad & (ii) Development of alignment of newly declared NH-131A from NH-34 junction near Malda, connecting proposed bridge over river Fulahar at Nakatti point up to Bihar border in the district of Malda, West Bengal | 80 | Ongoing |
4 | DPR of Ring Road around Bhavanagar city in state of Gujarat | 39.427 | Completed |
5 | 4- Laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh. | 127.425 | Ongoing |
6 | 4 laning of Ghaghra Bridge to Varansi section of NH-233 from Km. 121.800 to Km 180.420 (From Ghghra Bridge abutment on Basti side to Budhanpur Urban section) in the State of Uttar Pradesh. | 58.620 | Ongoing |
7 | 4- Laning with Paved Shoulders of NH-6 from Chichra to Kharagpur including Rehabilitation of existing four lane road from Km 134.400 to Km 129.600 in the State of West Bengal. | 55.520 | Ongoing |
8 | 4- Laning of Wardha-Butibori Section of NH-361 from km 465.500 to km 524.690 in the State of Maharashtra. | 59.190 | Ongoing |
9 | 4- Laning of Mahagaon to Yavatmal section of NH-361 in the state of Maharashtra. | 80.195 | Ongoing |
10 | 4- Laning of Yavatmal to Wardha section of NH-361 from Km 400.575 to Km 465.500 in the state of Maharashtra. | 64.925 | Ongoing |
11 | 4- Laning of Tuljapur – Ausa (including Tuljapur Bypass) Section of NH-361 from km 0.000 to km 55.835 in the State of Maharashtra | 67.428 | Ongoing |
12 | 4- lane with paved shoulder of Kalmath to Zarap section of NH-66 (Erstwhile NH-17) from Km 406/030 to Km 450/170 in the state of Maharashtra. | 44.140 | Ongoing |
13 | 2- Laning of Lebad SH – 31 –Manpur NH - 3 Road project in the state of Madhya Pradesh | 34 KM | Completed |
14 | 2- Laning of Ujjain – Jaora Road section in the state of Madhya Pradesh | 95 km | Completed |
15 | 4- Laning of Ahmedabad – Godhra Road Section of NH-59 in the State of Gujarat | 118 km | Completed |
16 | 4- Laning of Manor-Wada-Bhiwandi section of state highway in Maharashtra | 64 km | Completed |
17 | 2- lanning of Chhindwara to Matkuli section of SH - 19 in the state of Madhya Pradesh | 112 km | Completed |
18 | 2- lanning of Chandupur to Badwani SH - 26 in the state of Madhya Pradesh | 100 km | Completed |
19 | 2- lanning of Mandsaur to Sitamau Upto Raj Border section of SH – 14 in the state of Madhya Pradesh | 44 km | Completed |
20 | 4- Laning of Chikli – Khamgaon section of state highway in the state of Maharashtra | 64 km | Completed |
21 | 2- lanning of Bhind to Gopalpur section of SH - 2 in the state of Madhya Pradesh. | 51 km | Completed |
22 | 2- Laning of Badwani – Palsood - Sendhwa Road SH-39 in the state of Madhya Pradesh. | 57 km | Completed |
23 | 4-Laning of Mhow – Ghatabilod Section of SH-27 in the state of Madhya Pradesh | 27 km | Completed |
24 | 2/4 Laning of Bhuj-Bhachau Road section of SH-42 in the state of Gujarat. | 77 km | Completed |
25 | 2-Laning of Mundi-Sanawad Road in the state of Madhya Pradesh | 67.63 km | Completed |
26 | 4- Laning of Nagpur-Waingangā Section of NH-6 in the state of Maharashtra | 45.43 km | Completed |
27 | 4- Laning of Rewa-MP/UP Border of NH-7 in the state of Madhya Pradesh | 89.3 km | Completed |
28 | 2- Laning of Sitamau Suwasara road in the state of Madhya Pradesh. | 34.97 km | Completed |
29 | Intermediate Laning + 2- Laning of Package-IV Jaora – Piploda - Sailana, Neemuch – Jawad -Nayagaon, Soyat - Pidawa, Petlawad - Bamniya Road in the state of Madhya Pradesh. | 87.77 km | Completed |
30 | Intermediate Laning + 2- Laning of Pkg.-I Bamkhlafata – Dogawa – via – Borawa - Savardevala, Mundi – Dewala – Khutala - Atoot, Punasa – Mundi - Singhaji Road in the state of Madhya Pradesh. | 65.40 km | Completed |
31 | 2-Laning of Ashoknagar - Vidisha MDR Road on pattern | 35.68 km | Completed |
32 | 2-Laning of Betul-Sarni – Tikdhana - Junardeo-Parasia Road on Toll + Annuity basis | 124.1 km | Completed |
33 | Shadol - Singhpur - Turla - Pandaria Road Project (SH-09) | 121.09 km | Completed |
34 | Tikamgarh (Dhajrai) -Jatara-Palera-Nowgaon Major District Road on BOT basis in the state of Madhya Pradesh | 76.4 Km | Completed |
35 | 2- Lanning with paved shoulder of Rewa-Sidhi Section of NH-75E from km.2/8 to Km. 33/2 and Km. 55/4 to Km. 83/4 in the state of Madhya Pradesh | 57.8 | Completed |
36 | 2- lanning with paved shoulder of CHAS -RAMGARH section of NH-23 in the state of Jharkhand. | 67.327 | Completed |
37 | 2- lanning with paved shoulder of Chandragudem to AP/Telangana Border Section of NH-221 (New-NH-30) from Km 32.735 to Km 71.200 in the State of Andhra Pradesh | 37.89 | Completed |
38 | 2- lanning with paved shoulder of Kawardha - Bemetara - Simga Section NH-12A from Km. 245.375 to Km. 316.468 in the State of Chattisgarh | 71.093 | Completed |
39 | 2- lanning with paved shoulder of Shahdol to MP CG border section of NH-78 from Km. 142/2 (End of Shahdol Bypass) to Km.245/00 (at MP CG Border) in the State of Madhya Pradesh. | 91.8 | Completed |
40 | 4-Lane with Paved shoulder of Amritsar Tran-Tran Harike section of NH-15 FROM Existing km.445.250 of NH-1 TO Existing km 158.35 of NH-15 including construction of Amritsar and Naushera Bypasses in the state of Punjab. | 45.925 | Completed |
41 | 2-lane with paved shoulder of Adoni to Madhavaram via Mantralayam section of NH-167 from Km 70/000 to Km 125/150 in the State of Andhra Pradesh. | 55.026 | Completed |
42 | 4 Laning of Patiala-Bhatinda Section of NH-64 From Km 116.950 to Km137.850 & Km 142.950 to Km 168.000 Phase II in the State of Punjab. | 46.04 | Completed |
43 | 2-Laning of Patan Tendukheda Rehli section of SH-15 from Km 31/10 to Km 113/00 including Rehli Bypass in the State of Madhya Pradesh | 86.6 | Completed |
44 | 2-lane with paved shoulder Badnagar-Sunderabad-Unhel SH-18 from CH. 0+000 to 34+620 in the State of Madhya Pradesh. | 95.1 | Completed |
45 | 2-Lanning of Mandla Pindrari & Salimanabad Vilayatkalan section of MDR on in the state of Madhya Pradesh | 106.327 | Completed |
46 | 2-Laning with paved shoulder of Jabalpur Mandla Chilpi Section of NH-12A from km 85+400 to 177+750 in the state of MP on EPC mode. | 92.35 | Completed |
47 | 4-lanes with paved shoulders of Allahabad to UP/MP Border section of NH-27 from km 4.285 to km 45.627 to in the state of Uttar Pradesh. | 41.719 | Completed |
48 | 2-Lane with paved shoulder of Ibrahimpatnam Circle to Chandragudem Section of NH-221 (New NH-30) from Km 0.00 to Km. 32.735 in the State of Andhra Pradesh. | 32.3 | Completed |
49 | 2 laning of Silwani – Sagar- Sultanganj road SH – 15 in the state of Madhya Pradesh | 76 | Completed |
50 | 2- lane of Sardarpur – Badnawar SH - 35 in the state of Madhya Pradesh | 43 | Completed |
51 | 2- laning of Nadiad – Modasa SH - 59 in the state of Gujarat | 108.4 | Completed |
52 | 2 lane of Uchera – Nagod - Kalinger road section of SH-56 from km 0.000 to km 55.600 in the state of Madhya Pradesh | 55.6 | Completed |